Key Projects

2nd Qiantangjiang River Bridge in Hangzhou

24/11/2011

It won First Prize of Excellent Project under Ministry of Railways, Luban Prize of China Construction Project and Zhantianyou Prize for China Civil Project.

Taizhou Yangtze River Bridge

21/11/2011

It was commenced in December 2007 and will be completed in end of 2011.

Huanggang Road-Cum-Rail Yangtze River Bridge

21/11/2011

his bridge is a important link between Beijin--Jiulong Railway Line and Wuhan--Jiujiang Railway Line, also is a important link between DaqingGuangzhou Expressway Hubei Section and WuhanEzhou Expressway

Shilong Bridge in the Guang-Shen Railway Line

09/11/2011

With double railway lines on the deck, it is the first large-span PC bridges consisting of continuous girders in China. It won Luban Prize of China Construction Project.

Jinshajiang River Bridge at Sanduizi

09/11/2011

It is a single line railway bridge with total length of 403.851m. The main span of is 192m.The bridge was commenced in 1965 and completed in 1969

Xijiang River Bridge in Zhaoqing

07/11/2011

It won First Prize of Excellent Project under Ministry of Railways and Luban Prize of China Construction Project.

Sunkou Yellow River Bridge

07/11/2011

Integral panel technology was applied for the steel truss for the first time in China. It was awarded Prize for High-quality Project in Jing-Jiu Railway Line.

Wuhan Yangtze River Bridge

04/11/2011

The quantity of concrete used in substructure is 91,500 m3 and quantity of steel used in superstructure is 21,420 t. Tubular column drilling technique was adopted for the first time on the foundation.

Nanjing Yangtze River Bridge

04/11/2011

Substructure comprises four different types of foundations in water of 40m deep during construction. The quantity of concrete used is 384,000 m3 and quantity of steel used is 67,000 t.

Jiujiang Yangtze River Bridge

03/11/2011

The techniques of double-walled steel cofferdam with air screen, mortar casing deep caisson were adopted for the first time in the main bridge. Main truss was made of homemade 15 Manganese Vanadium Nitrogen steel products.

Home Previous Next Last

Shihu Bridge is a cable-stayed bridge without backstays carried by a single incl Shihu Bridge is a cable-stayed bridge without backstays carried by a single inclined H-shaped pylon. The span arrangemen
With a total length of 3,246m, Yiling Yangtze River Bridge is a three-pylon sing With a total length of 3,246m, Yiling Yangtze River Bridge is a three-pylon single-plane cable-stayed bridge with stiffe
The main bridge is a rigid frame with continuous PC box girder, and the span arr The main bridge is a rigid frame with continuous PC box girder, and the span arrangement is 123.6+170+123.6m. The total